An Algorithm for Load Planning of Renewable Powered Machinery with Variable Operation Time

Abdihakim Bokah, Alireza Maheri

Research output: Chapter in Book/Report/Conference proceedingPublished conference contribution

8 Downloads (Pure)

Abstract

This paper presents a multiobjective load planning algorithm for industrial applications with integrated hybrid renewable energy systems (HRES). The focus of the paper is on the planning of loads with time-dependent duration. In some cases, the duration of the machinery operation depends on the external parameters and can vary depending on what time of the day they are operating. The presented algorithm, implemented in the software MOHRES, is based on the multicriteria assessment of the system against several performance measures. Through a case study, the performance of the algorithm is evaluated. It is shown how the algorithm can successfully find Pareto solutions with minimal production cost and optimal HRES performance measures.
Original languageEnglish
Title of host publication6th International Symposium on Environment Friendly Energies and Applications
EditorsRadostina A. Angelova, Rositsa Velichkova
PublisherIEEE Explore
Number of pages5
ISBN (Electronic)978-1-7281-7011-4
ISBN (Print)978-1-7281-7012-1
DOIs
Publication statusPublished - 21 Apr 2021
Event6th International Symposium on Environment Friendly Energies and Applications - Vitosha Park Hotel/Technical University of Sofia, Sofia, Bulgaria
Duration: 24 Mar 202126 Mar 2021
Conference number: 6th
http://efeaconf.com/

Publication series

Name
ISSN (Print)2641-5925
ISSN (Electronic)2688-2558

Conference

Conference6th International Symposium on Environment Friendly Energies and Applications
Abbreviated titleEFEA 2021
Country/TerritoryBulgaria
CitySofia
Period24/03/2126/03/21
Internet address

Keywords

  • HRES
  • Hybrid renewable energy systems
  • load planning
  • energy efficient production
  • MOHRES

Fingerprint

Dive into the research topics of 'An Algorithm for Load Planning of Renewable Powered Machinery with Variable Operation Time'. Together they form a unique fingerprint.

Cite this